CASE STUDY

The Thermal Power Station in Nowy Dwór Mazowiecki

Description of the client
The Thermal Power Station in Nowy Dwór Mazowiecki produces thermal energy which is used for both heating and functional processes. The characteristic of the station's manufacturing activity is connected with the exploitation of wiring, for which obtaining an integrated permit is indispensable.

Description of the problem
The Board's directive from 24th of September 1996 96/61/WE relating to integrated prevention and limiting contamination called the IPPC directive, is the basis of the Station’s operators duty to obtain an integrated permit. After transposing the recordings of this directive to the polish law by the act -The Law of Environmental Protection from 27th of April 2001(Dz. U. 2001.62.627 with later changes), the operators of wirings defined by the Regulation of the Minister of the Environment relating to wirings which could cause major contamination of particular elements of the environment or the environment as a whole are obliged under the threat of stopping the work of the installation, to obtain such a permit. The deadline for obtaining an integrated permit for wirings in the heating manufacturing, whose utilization began before 30.10.2005 was set for 30th of June 2006.

In connection with that the Station had to face a problem of preparing a proposal enabling them to obtain such a permit. The Process of preparing a proposal is tedious and requires a wide range of knowledge in many fields connected with the protection of the environment. In the first place it is very time-consuming which practically made it impossible for the Station's workers, which are obliged to do their duties in the first place, to take care of it. In this situation Ecosolution offered to prepare the proposal for obtaining the integrated permit along with carrying out the indispensable examinations and measurements.

How Ecosolution dealt with the problem
Ecosolution accomplished creating a proposal for obtaining an integrated permit in three stages:
As a part of stage I Ecosolution consultants performed necessary examinations and measurements as well as elaborated the Ist version of the proposal, which was handed over to the client for evaluation and additional comments. After making amendments a final version of the proposal was created. It was then, along with a registration fee delivered by the client to an institution appropriate for licensing an integrated permit.

Stage II comprised carrying out by our experts consultations and negotiations with the institution licensing integrated permits.

In relation to the knowledge about The Thermal Power Plant's problems every piece of work connected with carrying out the proposal for obtaining an integrated permit was performed by Ecosolutions consultants along with the help of people assigned by the Thermal Power Plant.

Benefits
Quickness and complexity of the creation of the proposal for an integrated permit performed by our company has made it possible for the Thermal Power Plant to obtain an integrated permit before the deadline determined dy the regulation. Thanks to that it was possible to avoid the danger of stopping the work of the installation.
Kontakt
telefon:
(+48) 22 180 16 81
mobile:
+48 608 076 086
fax:
(+48)22 180 16 82
e-mail:
 
clients

Spożywcza
Danone Sp. z o.o.

Obróbka metali
Zakłady Elektronowe "Lamina S.A"
w Piasecznie
 
clients opinions
Dzięki zaangażowaniu i fachowości zespołu Ecosolution, nasza firma uzyskała szybką odpowiedź urzędu w interesującej nas sprawie. Z całą odpowiedzialnością możemy polecić usługi doradcze świadczone przez firmę Ecosolution."

Zakłady Elektronowe "Lamina S.A" w Piasecznie www.thales-lamina.com.pl
© 2005-2009 Solution Grupa TQMC | Wszelkie prawa zastrzeżone
Projekt & cms: www.zstudio.pl